The CEMS management system and DAHS Improvement project

Absrtact
The aims of this plan are to review the execution effect of the audit of continuous emission monitoring systems (CEMS) by the stationary sources, complete the CEMS law, avoid the CEMS data counterfeit, CEMS data transfer to EPA from stationary sources, rising the data management correctness and efficiency, study and address the 4th announcement list of the stationary sources to set up CEMS and connect to EPB, and assessment to set up pollution and defend and make facilities and operating and noting down the line and early warning mechanism while grinding drafting and the fourth batch of announcement. Up to date, We have already responses 252 letter for CEMS questions form 2004 to 2010. We have collected the new revised CEMS law for America, European Union, Japan, and China and comparison with CEMS law of Taiwan. The ones that have already integrated the database of stationary source and combines the link at present, the air pollution fee database is combined and linked, CEMS database finishes monitoring the facilities databases. Have already further revised CEMS management revision draft content according to 2008 CEMS management revision draft at present, this text of draft reduces to 24 after adding and deleting, it is 8 that the appendix is simplified by 14 original appendices after amalgamating and newly-increased. Already all circles used and then gave relevant opinions successively so far to 2003 at present, problem happening after other relevant regulations include in CEMS and employ and revising “CEMS management law” soon, consult SCAQMD and examine the manual newly, it revise tentatively “installation, confirm and data report check/coaching manual of at-situ audit” and form, etc. We have already finished CEMS and monitored the systematic picture of database log-in of all unit of facilities to extract, the competent authorities of counties and cities have also already finished the log-in that CEMS monitored all unit of facility of flue of area under one's jurisdiction before August 31, 2009. The staff planners have finished analyzing and making up and investigating that monitor materials such as instrument of facilities, the circuit of the controller, type specification, etc. and establish relevant materials such as the database, etc. in the place public and private. Have already assessed the stationary sources of the 4th proclamation that require to set up CEMS, the objects including the commitment of environmental impact assessment for the new source, the suggestion (Total reduced sulphur, TRS) of local Environmental Protection Bureau, waste incinerator with smaller capacity, the measurement of greenhouse gas CO2, the VOCs emission from photo electricity industry, sticky tape industry, semiconductor industry, petrochemical industry and other regulation demand. That will increase discharge channel quantity about 675-1,264. It will be bulletin at one times and accomplished stage by stage to implement offer public and private place, local competent authority and check organization more abundant time to finish setting up and managing to plan to adopt once in the future. This plan has already collected brand-new CPMS performance norm (PS17) that U.S.A. environmental protection administration puts forward on October 9, 2008 completely at present Protect the step draft with the product. PS17 department used for, monitor some control process or the pollution, prevent from CPMS to make facility their monitor quality can accept performance norms made after the first installation for assess (including install and confirm). PS17 puts forward and tabulates the operation parameter including temperature, pressure, flowing rate of angry liquid volume, flowing rate of firm liquid quality (mass flow rate) managed at present , pH and electric conductance degree (conductivity) When. Tabulate, in charge of target like temperature, pressure, volume flow of gas/liquid, mass flow of solid/liquid, pH or EC (Electrical Conductivity) to be the operate state indicator of CPMS for the pollution sources or pollution prevention facility. Finish the planning of the early warning mechanism and make the connected form of the operating record for the pollution prevention facilities. It also makes the apparatus “offering medicine amount” line test of the signal with and on the preventing from of the Lize incinerator P001 flue.
Keyword
CEMS, QAQC, DAHS, Alarm system
Open
top